    General Hospital of 250 Beds

    General Hospital of 250 Beds
    General Hospital of 250 Beds
    ₹ 0 INR
      Why Choose Us
      • More than 45 years of experience
      • Managed by expert industrial consultants
      • ISO 9001-2015 Certified
      • Registered under MSME, UAM No: DL01E0012000
      How we work
      • 24/5 Research Support
        Get your quesries resolved from an industry expert. Ask your queries before report or book purchase.
      • Custom Research Service
        Speak to the our consultant to design an exclusive study to serve your research needs.
      • Quality Assurance
        All reports are prepared by highly qualified consultants & verified by a panel of experts.
      • Information Security
        Your personal & confidential information is safe & secure.

      GENERAL HOSPITAL OF 250 BEDS

      [EIRI/EDPR/4654] J.C.: 2871BDT


      The Constitution of the People's Republic of Bangladesh establishes the role of the State in ‘planned economic growth’ and ‘improvement in the material and cultural standard of living of the people’. The government is responsible to its citizens for their basic needs, for example, ‘food, clothing, shelter, education and medical care’ (article 15(a)). Article 18(1) of the constitution establishes that the State shall have regard to ‘raising the level of nutrition and the improvement of public health’ (article 18(1)).

      Geographic context

      Bangladesh covers 147 570 square kilometres, and is densely populated with approximately 1 286 people per square kilometre. It is the world’s seventh most climate risk-affected country, with 185 extreme events recorded and 0.38 fatalities per 100 000 inhabitants between 2000 and 2019. According to a 2022 World Bank report, climate-related cyclones, flooding, drought, change of disease patterns and loss of agricultural lands threaten communities causing disproportional damage and disrupting lives and livelihoods. Floods have caused severe economic impacts in Bangladesh, while cyclones are responsible for the highest number of deaths. Heat stress, river and coastal flooding and landslides are predicted to increase between 2041 and 2060 with devastating effects even under low-emission scenarios.


      COST ESTIMATION

      Land & Building (8092 sq.mt.)    BDT 34.46 Cr    

      Plant & Machinery                    BDT 40.00 Cr 

      Working Capital for 2 Months    BDT 1.34 Cr 

      Total Capital Investment          BDT 78.81 Cr 

      Rate of Return                          3%

      Break Even Point                      93%


      CONTENTS

      INTRODUCTION

      GEOGRAPHIC CONTEXT

      DEMOGRAPHIC CONTEXT

      ECONOMIC CONTEXT

      VULNERABLE GROUPS

      OVERVIEW

      FIGURE 1: ORGANOGRAM OF THE MOHFW, 2020

      ADMINISTRATIVE STRUCTURE

      TABLE 1: ADMINISTRATIVE UNITS OF BANGLADESH

      TABLE 2: THE FOUR TIERS OF THE ESSENTIAL HEALTH SERVICE PACKAGE, ADAPTED FROM MOHFW'S HEALTH NUTRITION POPULATION SECTOR STRATEGIC INVESTMENT PLAN (HNPSIP)

      PUBLIC SECTOR

      URBAN HEALTH SERVICES – PRIMARY CARE

      RURAL HEALTH SERVICES – PRIMARY CARE

      TABLE 3: PRIMARY HEALTHCARE FACILITIES RUN BY THE DGHS, ADAPTED FROM MOHFW, HEALTH BULLETIN 2020 (DECEMBER)

      SECONDARY CARE

      TERTIARY CARE

      PRIVATE SECTOR

      HEALTHCARE RESOURCES

      PHARMACEUTICAL SECTOR

      PATIENT PATHWAYS

      THE MOST IMPORTANT STATISTICS

      ECONOMIC FACTORS

      HEALTH SERVICES PROVIDED BY THE STATE/PUBLIC AUTHORITIES

      FIGURE 3: CURRENT HEALTH EXPENDITURE PER CAPITA (CURRENT USD) - BANGLADESH

      FIGURE 4: SHOWS PER CAPITA SPENDING AS A PERCENTAGE OF GROSS DOMESTIC PRODUCTS (GDP). THIS HAS RISEN GRADUALLY FROM 2.11 % IN 2000 TO 2.63 % IN 2020.

      FIGURE 4: CURRENT HEALTH EXPENDITURE AS A PERCENTAGE OF GROSS DOMESTIC PRODUCTS (GDP)

      RISK-POOLING MECHANISMS

      COMMUNITY-BASED HEALTH INSURANCE SCHEMES

      PRIVATE INSURANCE COMPANIES

      TABLE 4: PERCENTAGE OF GROSS PREMIUM IN LIFE INSURANCE (2015 TO 2019)

      OUT-OF-POCKET HEALTH EXPENDITURE

      FIGURE 5: HOUSEHOLD OUT-OF-POCKET PAYMENT AS A PERCENTAGE OF CURRENT HEALTH EXPENDITURE

      FIGURE 5: USES CURRENT HEALTH EXPENDITURE (CHE) TO SHOW THAT OOPS HAVE INCREASED SINCE 2000 AND THAT THEY HAVE BEEN ABOVE 70 % OF CHE SINCE 2014.

      FIGURE 6: SHOWS A STEADY INCREASE IN THE MONEY PAID BY EACH HOUSEHOLD RISING TO A HIGH OF USD 37.49 [EUR 34] IN 2020.

      FIGURE 6: HOUSEHOLD OUT-OF-POCKET PAYMENT IN CURRENT USD PER CAPITA

      TABLE 5: COST BURDEN ACROSS SOCIOECONOMIC GROUPS FROM A HOUSEHOLD SURVEY IN DHAKA URBAN AREA

      COST OF CONSULTATIONS

      COST OF MEDICATION

      PROJECT LOCATION

      SERVICES

      INTRODUCTION

      DRIVERS OF GROWTH

      DEMOGRAPHIC, EPIDEMIOLOGICAL AND HEALTH TRANSITIONS

      WHAT LICENSE REQUIRED TO OPEN A HOSPITAL AND THEIR PROCEDURE

      NECESSARY LICENSES REQUIRED OPENING A HOSPITAL

      REGISTRATION OF HOSPITAL

      LAND AND CONSTRUCTION

      ELECTRICITY AND WATER

      SEWAGE

      BIOMEDICAL WASTE

      FIRE AND HEALTH LICENSE

      REGULATIONS RELATING TO EMPLOYMENT OF STAFF

      SIGN BOARDS

      FOOD MANUFACTURING LICENSE FOR OPERATING A KITCHEN

      PERMIT TO STORE LPG CYLINDER

      PHARMACY REGISTRATION FOR MEDICAL SHOP

      TRADEMARK REGISTRATION

      VEHICLE REGISTRATION FOR AMBULANCES

      ARMS LICENSES UNDER ARMS ACT

      WASTE DISPOSAL

      PLANNING THE HOSPITAL INFRASTRUCTURE

      ONE MUST TAKE CARE OF THESE THINGS;

      THE OTHER IMPORTANT LICENSE REQUIRED IS:

      LIST OF 250-300 BED HOSPITAL IN BANGLADESH

      BRIEF DESCRIPTION OF SOME COMMON HOSPITAL EQUIPMENTS

      1. DRESSING DRUM

      2. SURGICAL TRAY

      3. CATHETHER TRAY

      4. SYRINGE CASE

      5. ANIMA POT

      6. BOWEL

      7. BED POT (LATRINE)

      8. URINAL POT

      9. KIDNEY TRAY

      10. SPIT-ON

      11. ELECTRICAL STERILIZER

      BUILDING CONSTRUCTION & FURNISHING OF HOSPITAL

      1. CARDIOLOGY

      2. E.N.T.

      3. MATERNITY

      4. EYE SECTION

      5. CHILDREN WARD

      6. LABORATORY

      7. X-RAY ROOM & ECG CLINIC

      8. PHYSICIAN

      GENERAL HEALTH AMENITIES

      DRUG SITUATIONS

      LISTED BELOW ARE THE DESIRED FEATURES OF AUTOMATED BIOCHEMICAL ANALYZERS.

      MODERN MEDICAL EQUIPMENT

      COMPUTER TOPOGRAPHY

      ULTRASOUND

      CATHETERS IN INTERVANTIONAL PROCEDURES ARE MAINLY USED FOR:

      CONSUMABLE STORES

      UTILITIES & OVERHEADS

      1. POWER/LIGHT CONSUMPTION:-

      2. WATER:-

      HOSPITAL/MEDICAL EQUIPMENTS AND SUPPLIERS

      MACHINERY & EQUIPMENT SUPPLIERS

      X-RAY ACCESSORIES

      AIR CONDITIONING & REFRIGERATION UNITS

      IMPORTED PLANT & MACHINERY SUPPLIERS

      LIST OF CONSULTANT FOR SETTING UP HOSPTAL

      LIST OF NABET ACCREDITED HOSPITAL & HEALTHCARE CONSULTANT (NABH STANDARD)

      HOSPITAL/MEDICAL EQUIPMENTS AND SUPPLIERS

      PROPOSED MINIMUM STANDARDS FOR PRIVATE HOSPITAL

      UP-TO 250 BEDDED UNIT PROVIDING (MEDICAL/SURGICAL/MATERNITY SERVICES ETC.)

      BASIC FUNCTIONS PROVIDED BY A HOSPITAL

      HUMAN RESOURCE REQUIREMENT

      QUALIFICATIONS

      AVAILABILITY OF PERSONNEL:

      MINIMUM REQUIREMENT OF PERSONNEL:

      DUTY MEDICAL OFFICER

      NURSING STAFF:

      NURSING AIDS:

      PARAMEDICAL STAFF:

      ENGINEERING STAFF:

      ADMINISTRATIVE AND ANCILLARY STAFF

      INSTRUMENTS AND EQUIPMENT

      ENTRANCE ZONE

      RECEPTION AND REGISTRATION WITH CASHIER

      WAITING AREA

      AMBULATORY ZONE

      A. NURSING

      B. TREATMENT/DRESSING ROOM AND INJECTION ROOM

      C. EXAMINATION AND CONSULTATION ROOMS (OPDS) AND CASUALTY

      D. PHARMACY

      DIAGNOSTIC ZONE (OPTIONAL)

      PATHOLOGY

      RADIOLOGY (OPTIONAL)

      INTERMEDIATE ZONE

      A. WARDS

      B. NURSING STATION

      C. TREATMENT ROOM

      D. TROLLEY BAY

      E. WARD STORE

      OPERATION THEATRE

      INSTRUMENTS FOR GENERAL SURGERY & (MATERNITY) OBSTETRICS/GYNAECOLOGY

      OPERATION THEATRE

      EQUIPMENT FOR SURGERY AND OBSTETRICS/GYN

      DELIVERY SUITE: EQUIPMENT & INSTRUMENTS (FOR MATERNITY HOMES ONLY)

      A. EXAMINATION AND PREPARATION

      B. LABOUR ROOM

      C. DELIVERY ROOMS

      EQUIPMENT FOR SERVICE ZONE

      LAUNDRY

      GENERATOR

      MINIMAL FUNCTIONAL AND SPACE REQUIREMENTS

      ENTRANCE ZONE

      AMBULATORY ZONE

      DIAGNOSTIC ZONE (OPTIONAL)

      THIS ZONE SHOULD IDEALLY BE INTERPOSED BETWEEN OPD AND IPD.

      CRITICAL ZONE

      OPERATING SUITE

      BASIC DESIGN STANDARDS

      MINIMUM SPACE REQUIREMENTS

      A. PROTECTIVE ZONE

      B. CLEAN ZONE

      C. ASEPTIC ZONE

      INTERMEDIATE ZONE

      SERVICE ZONE

      BUILDING ENGINEERING ENVIRONMENTAL STANDARDS

      1. CATION

      2. CEILINGS

      3. FLOOR HEIGHT

      4. FLOORS AND WALLS

      5. DOORS:

      6. WINDOWS

      7. CORRIDOR

      8. WATER SUPPLY, PLUMBING AND OTHER PIPING SYSTEMS

      FOR MORE THAN 50 BEDS

      FOR LESS THAN 100 BEDS

      OXYGEN CYLINDERS

      9. ELECTRICAL STANDARDS

      10. ACCESS ROUTES TO VARIOUS FACILITIES OF THE NURSING HOME:

      11. COMMUNICATION SYSTEM

      12. FIRE-FIGHTING SYSTEM

      13. VENTILATION REQUIREMENTS FOR AREAS AFFECTING PATIENT CARE IN NURSING HOMES

      14. REQUIREMENTS FOR SANITARY FITMENTS IN NURSING HOMES FOR PATIENTS

      INPATIENT WARDS AND NURSING UNITS

      OUTPATIENT BLOCK

      THE RADIOLOGY DEPARTMENT MUST HAVE FOLLOWING SPECIAL TOILET FACILITIES IN CASE IT CARRIES OUT PROCEDURES LIKE IVP.

      PROJECT PLANT LOCATION FACTORS

      PRIMARY FACTORS

      1. RAW-MATERIAL SUPPLY:

      2. MARKETS:

      3. POWER AND FUEL SUPPLY:

      4. WATER SUPPLY:

      5. CLIMATE:

      SPECIFIC FACTORS

      6. TRANSPORTATION:

      7. WASTE DISPOSAL:

      8. LABOR:

      9. REGULATORY LAWS:

      10. TAXES:

      11. SITE CHARACTERISTICS:

      12. COMMUNITY FACTORS:

      13. VULNERABILITY TO WARTIME ATTACK:

      14. FLOOD AND FIRE CONTROL:

      PLANNING OF EACH FLOORS ARE AS FOLLOWS

      EXPLANATION OF TERMS USED IN THE PROJECT REPORT

      1. DEPRECIATION:

      2. FIXED ASSETS:

      3. WORKING CAPITAL:

      4. BREAK-EVEN POINT:

      5. OTHER FIXED EXPENSES:

      6. MARGIN MONEY:

      7. TERM LOANS:

      8. TOTAL LOAD:

      9. LAND AREA/MAN POWER RATIO:

      ENVIRONMENTAL MANAGEMENT PLAN 

      AIR ENVIRONMENT

      NOISE ENVIORNMENT

      SOLID WASTE MANAGEMENT

      OPERATION PHASE

      WATER MANAGEMENT (SOURCE & SUPPLY OF WATER)

      SEWERAGE

      SCHEME OF SEWAGE TREATMENT PLANT:

      TREATMENT PROCESS:

      THE PROCESS FOR SEWAGE TREATMENT PLANT BASED ON MBBR TECHNOLOGY

      SCHEMATIC REPRESENTATION OF STP BASED ON MBBR TECHNOLOGY

      BENEFITS OF USING MBBR TECHNOLOGY

      PROCESS FLOW DIAGRAM FOR ETP

      THE HOSPITAL AND LABORATORY WASTE WATER WILL BE TREATED IN 170 KLD ETP.

      ETP DESIGN

      TREATED EFFLUENT CHARACTERISTICS

      WATER CONSERVATION & AUGMENTATION

      RAINWATER HARVESTING TABLE: 

      RAINWATER HARVESTING CALCULATIONS

      BLOCK DIAGRAM FOR PROPOSED RAIN WATER HARVESTING/AQUIFER RECHARGING SYSTEM

      SCHEMATIC REPRESENTATION OF THE RAINWATER HARVESTING SYSTEM

      SOLID WASTE MANAGEMENT

      SOLID WASTE GENERATION

      TABLE: TOTAL SW GENERATION FROM THE PROPOSED PROJECT

      NO OF TRANSIT CENTERS:-

      COMPOST FORMATION POTENTIAL OF THE PROJECT

      COMPOST GENERATION POTENTIAL OF THE PROJECT (CHEN, 2016)

      TENTATIVE DETAILS OF ORGANIC WASTE CONVERTOR:

      STANDARD OPERATING PROCEDURE OF ORGANIC WASTE CONVERTER:

      TABLE: HOSPITAL AND BIOMEDICAL WASTE GENERATION FROM BEDDED AREA (MINISTRY OF HEALTH AND FAMILY WELFARE; PANDIT ET AL 2006)

      SEGREGATION OF BIOMEDICAL WASTE AND ITS STORAGE:-

      BIOMEDICAL WASTE CATEGORIZATION

      BMW WILL BE SEGREGATED AND COLLECTED AND THEN WILL BE HANDED OVER TO A UPPCB APPROVED BMW VENDOR.

      AIR POLLUTION CONTROL: 

      STACK HEIGHT CALCULATIONS

      LANDSCAPING & HORTICULTURE

      SHRUBS/HERBS TO BE PLANTED

      PROJECT LOCATION

      IMPLEMENTATION SCHEDULE

      PROJECT IMPLEMENTATION WILL TAKE A PERIOD OF 18 MONTHS

      LIST PLANT & MACHINERY

      DEPARTMENT OF NEPHROLOGY

      DEPARTMENT OF CARDIOLOGY

      DEPARTMENT OF UROLOGY

      DEPARTMENT OF ORTHOPAEDICS

      DEPARTMENT OF NEUROSURGERY

      MAJOR LIST OF EQUIPMENTS

      DEPARTMENT OF NEPHROLOGY

      MAJOR EQUIPMENTS

      DIALYSIS MACHINE

      MICROSCOPE

      DEPARTMENT OF CARDIOLOGY

      MAJOR EQUIPMENTS/INSTRUMENTS

      ECHO CARDIOGRAPHY MACHINES 

      TMT WIPRO GE MACHINE  

      TWO FLAT PANEL CATH LABS 

      ST. JUDE EP SYSTEM

      HOLTER MONITOR – ECG  

      AMBULATORY BP   

      CX 50   

      TILT TABLE   

      DEPARTMENT OF UROLOGY

      MAJOR EQUIPMENTS

      DA VINCI ROBOT 

      MODULAR OPERATION THEATRES

      DORNIER COMPACT SIGMA LITHOTRIPSY MACHINE   

      MEDISON ULTRASOUND MACHINE

      RIGISCAN PLUS

      MMS URODYANAMICS MACHINE

      ENDO UROLOGY INSTRUMENTS  

      100 WATT HOLMIUM LASER   

      A MOBILE C-ARM IS A MEDICAL IMAGING DEVICE   

      DEPARTMENT OF ORTHOPAEDICS

      MAJOR EQUIPMENTS

      ARTHROPLASTY   

      ARTHROSCOPY SET   

      INTERLOCK NAIL   

      ARTHROSCOPY TROLLEY  

      DEPARTMENT OF NEUROSURGERY

      MAJOR EQUIPMENTS

      MEDTRONIC 58 NAVIGATION SYSTEMS (FULLY LOADED CRENIAL AND SANAL OPTICAL AND ELECTROMAGNETIC SYSTEM)  

      DEDICATED CUSA (CAUITRON ULTRASONIC SURGICAL ASPIRATDR)   

      MEDTRONICS HIGH SPEED DRILL SYSTEM   

      WELL EQUIPPED OPERATION THEATER WITH INTEGRATED WORKSTATION (MICROSCOPE, ENDOSCOPE AND NAVIGATION SYSTEM)

      DEDICATION WELL EQUIPPED NEUROSURGICAL ICU   

      MICROSCOPE:- FIRST FULLY LOADED ROBOTIC 3D MICROSCOPE WITH 30 EXOSCOPE AND ENDOSCOPE   

      SPECIFICATIONS OF STANDARD LIST OF MEDICAL EQUIPMENT 

      LIST OF USEFUL LINKS


      APPENDIX – A:

      01. PLANT ECONOMICS

      02. LAND & BUILDING

      03. PLANT AND MACHINERY

      04. OTHER FIXED ASSESTS

      05. FIXED CAPITAL

      06. RAW MATERIAL

      07. SALARY AND WAGES

      08. UTILITIES AND OVERHEADS

      09. TOTAL WORKING CAPITAL

      10. TOTAL CAPITAL INVESTMENT

      11. COST OF PRODUCTION

      12. TURN OVER/ANNUM

      13. BREAK EVEN POINT

      14. RESOURCES FOR FINANCE

      15. INSTALMENT PAYABLE IN 5 YEARS

      16. DEPRECIATION CHART FOR 5 YEARS

      17. PROFIT ANALYSIS FOR 5 YEARS

      18. PROJECTED BALANCE SHEET FOR (5 YEARS)


      How to Make Project Report?

      Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

      Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.

      We can prepare detailed project report on any industry as per your requirement. 

      We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.

      Detailed Project Report (DPR) gives you access to decisive data such as:

      • Market growth drivers
      • Factors limiting market growth
      • Current market trends
      • Market structure
      • Key highlights

      Overview of key market forces propelling and restraining market growth:

      • Up-to-date analyses of market trends and technological improvements
      • Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
      • An array of graphics, BEP analysis of major industry segments
      • Detailed analyses of industry trends
      • A well-defined technological growth with an impact-analysis
      • A clear understanding of the competitive landscape and key product segments

      Need Customized Project Report?

      1. Ask for FREE project related details with our consultant/industry expert.
      2. Share your specific research requirements for customized project report.
      3. Request for due diligence and consumer centric studies.
      4. Still haven't found what you're looking for? Speak to our Custom Research Team

      About Engineers India Research Institute:

      EIRI Board is a single destination for all the industry, company and country reports. We feature large repository of latest industry reports, leading and niche company profiles, and market statistics prepared by highly qualified consultants and verified by a panel of experts.

      Note: We can also prepare project report on any subject based on your requirement and country. If you need, we can modify the project capacity and project cost based on your requirement.

      Our reports provide an expansive market analysis of the sector by covering areas like growth drivers, trends prevailing in the industry as well as comprehensive SWOT analysis of the sector.

      Our Clients

      Our Approach

      • Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
      • The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
      • We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report

      Why buy EIRI reports?

      1. Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
      2. Offer real analysis driving variables for the business and most recent business sector patterns in the business
      3. This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
      4. Report gives investigation and top to bottom money related correlation of real players/competitors
      5. The report gives gauges of key parameters which foresees the business execution