Menu
Your Cart

    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)

    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)
    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)
    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)
    New
    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)
    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)
    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)
    Complete Handbook of Industrial and Agricultural Waste Recycling (Metal, Plastic, Organic, Bio- medical, Rice Bran Oil, E-Waste & Emerging Recycling Technologies)
    ₹ 2,500 INR
      Why Choose Us
      • More than 45 years of experience
      • Managed by expert industrial consultants
      • ISO 9001-2015 Certified
      • Registered under MSME, UAM No: DL01E0012000
      How we work
      • 24/5 Research Support
        Get your quesries resolved from an industry expert. Ask your queries before report or book purchase.
      • Custom Research Service
        Speak to the our consultant to design an exclusive study to serve your research needs.
      • Quality Assurance
        All reports are prepared by highly qualified consultants & verified by a panel of experts.
      • Information Security
        Your personal & confidential information is safe & secure.

      This book contains chapters on: Part 1: Foundations of

      Waste Management - Beginning, Effective Waste Management

      Planning Details, Part 2: Metal & Electronic Waste Recycling

      - Automated Vehicle Scrapping Plant, Recycling Plant of Metal,

      Copper Scrap Recycling, Lead Acid Battery Recycling Unit, EWaste

      Recycling, Lithium-Ion Battery Recycling Unit, Aluminium

      Recycling Plant, Part 3: Agricultural & Organic Waste Utilization

      - Bio Coal Briquettes from Agricultural Waste, Organic Fertilizer

      Manufacturing from Cow Dung, Particle Board from Rice Husk,

      Rice Bran Oil Extraction Process, Pathogen Reductions during

      Waste Treatment, Part 4: Plastic & PET Waste Recycling -

      Flexible and Rigid Plastic Recycling , Plastic Granules from Plastic

      Waste, Recycling of PET Bottles, Polyester Staple Fiber from

      PET Waste, PET Bottles from PET Preform, PET Flakes from

      PET Bottles, Texturised Yarn from Waste PET Bottles, FSSAI’s

      Guidelines for Recycled PET in Food Contact Materials, Financial

      Support for Establishing Recycling Plants, Part 5: Other

      Specialized Recycling Processes - Caffeine Extraction from Tea

      Waste, Disposable Tableware from Sugarcane and Wheat

      Bagasse, Lubricating and Waste Oils Recycling, Waste Tyre

      Pyrolysis, Biomass Charcoal Unit, Activated Carbon from Coconut

      Shell Unit, Part 6: Compliance, Standards, and Resources -

      Biomedical Waste Management Unit, BIS Standards, Photographs

      of Plant and Machinery with Suppliers Contact Details, Part 7:

      Innovation, Sustainability and Future Trends in Waste

      Management - Carbon Credit Opportunities in Waste Management,

      Green Hydrogen Production from Waste Streams and AI and IoT

      in Waste Processing Automation.

      The book has been written for the benefit and to prove an

      asset and a handy reference guide in the hands of new

      entrepreneurs and well established industrialists. 


      PART 1: FOUNDATIONS OF

      WASTE MANAGEMENT

      Chapter 1

      Beginning ....................... 3-7

      Fundamentals of waste

      management .................... 3

      Waste hierarchy ....................... 3

      Product life-cycle ..................... 4

      Resource efficiency ................. 4

      Beginning ................................ 5

      Ancient Times ......................... 5

      Middle Ages ............................. 5

      Industrial Revolution ............... 6

      20th Century ............................ 6

      21st Century ............................ 7

      Chapter 2

      Effective Waste Management

      Planning

      Details ...................... 8-15

      Steps for Effective Waste

      Management Planning .... 9

      Identify the Waste Your Facility

      Creates ............................. 9

      Contents-cum-Index

      Identify Waste Streams ......... 10

      Establish a Waste

      Management Team ........ 11

      Assess Current Waste

      Disposal Methods .......... 11

      Select Waste Management

      Partners .......................... 13

      Set Targets for Waste

      Reduction ....................... 14

      Create a Waste Management

      Action Plan ..................... 14

      Train Employees on New

      Procedures ..................... 15

      Track Your Progress and

      Monitor for Adjustments . 15

      PART 2: METAL &

      ELECTRONIC

      WASTE RECYCLING

      Chapter 3

      Automated Vehicle Scrapping

      Plant .............. 19-28

      Challenges ............................ 20

      Opportunities ......................... 20

      Tata Motors opens auto

      dismantling facility ......... 21

      Maruti Suzuki and Toyota

      Tsusho Group’s Vehicle

      Scrapping and Recycling

      unit commences

      operations ...................... 22

      Scope of recycling in India ... 23

      Setting up, Authorization, and

      Operation of Authorized

      Vehicle Scrapping Facility

      (AVSF) ............................. 23

      Eligibility For Vehicle Scrapping

      and Recycling Facility

      Certificate ....................... 25

      The Entity ............................... 25

      Criteria for Scrapping of Vehicle

      25

      Process for Vehicle Scrapping

      and Recycling Facility .... 26

      Certificate of Vehicle

      Scrapping ....................... 26

      Validity and Renewal of Vehicle

      Scrapping and Recycling

      Facility ............................. 27

      Applicable Rules /Acts .......... 27

      Chapter 4

      Recycling Plant of

      Metal ...................... 29-34

      Key Metal Recycling Plants and

      Companies in India: ...... 29

      Benefits of Setting up a Metal

      Recycling Plant .............. 33

      Chapter 5

      Copper Scrap

      Recycling ............... 35-43

      Copper is 100% Recyclable . 35

      Recycling Reduces CO2

      Emissions and Energy

      Use ................................. 36

      Understanding grades of

      copper scrap .................. 36

      #2 Copper ............................. 36

      #1 Copper ............................. 37

      Bare Bright Copper ............... 37

      #2 Insulated Wire .................. 37

      #1 Insulated Wire .................. 38

      The Upward Casting Method 38

      Continuous Casting and

      Rolling (CCR) Method ... 39

      Comparison and

      Applications .................... 39

      Beijing Holland Copper

      Recycling Solutions ....... 39

      Transforming copper scrap into

      premium products ......... 40

      Great demand for high-quality

      copper recycling ............. 40

      Environmental

      Considerations .............. 41

      The Copper Recycling

      Process .......................... 42

      Sorting: The Gateway to

      Copper Recycling .......... 42

      Shredding: Breaking Down the

      Barrier ............................. 42

      Melting: From Solid to Liquid

      Gold ................................ 43

      Purification: Refining

      Excellence ...................... 43

      Chapter 6

      Lead Acid Battery

      Recycling Unit ....... 44-54

      Importance of Recycling Lead-

      Acid Batteries ................. 44

      The Recycling Process ......... 45

      Step 1: Collection .................. 45

      Step 2: Breaking and

      Separation ...................... 45

      Step 3: Lead Melting and

      Refining .......................... 46

      Step 4: Plastic Recycling ..... 46

      Step 5: Electrolyte Treatment 46

      Step 6: Pollution Control and

      Compliance .................... 46

      Step 7: Sustainable Reuse .. 46

      Challenges in Lead-Acid

      Battery Recycling ............ 46

      Best Practices for Safe and

      Efficient Recycling .......... 47

      Lead Acid Battery Recycling

      Plant Setup ..................... 48

      Benefits of Lead Acid Battery

      Recycling Plant Setup .... 48

      Environmental Benefits ......... 48

      Commercial Benefits ............ 49

      Social Benefits ...................... 49

      Requirement for Lead Acid

      Battery Recycling Plant .. 49

      Documents for Lead Acid

      Battery Recycling Plant

      Setup .............................. 50

      Personal Documents ............ 50

      Company Related

      Documents ..................... 50

      Other Permissions ................ 51

      Process for Lead Acid Battery

      Recycling Plant Setup in

      India ................................ 51

      Documentation Process of

      Lead Acid Battery Recycling

      Plant ............................... 52

      Recycling Process of Lead Acid

      Battery ............................. 52

      Lead Acid Battery Recycling

      Plant Cost and Fees ..... 54

      Chapter 7

      E-Waste Recycling ...... 55-67

      Exposure to e-waste ............. 58

      Children are the most

      vulnerable ....................... 58

      Aspects of E-Waste

      Recycling ........................ 60

      Prevention and management60

      e waste management and

      recycling technologies ... 61

      Key Processes ...................... 62

      International agreements ..... 62

      WHO response ..................... 63

      Technological Advancements in

      E-Waste Management ... 63

      The Traditional Methods of

      Copper, Silver, Gold, and

      Palladium extraction from

      E-Waste .......................... 66

      Cyanide Usage ..................... 66

      Use of Acid ........................... 66

      Extraction Through the

      Bioleaching .................... 66

      Procedure for the Extraction of

      Metals (gold, silver, copper,

      platinum) from

      the E-waste .................... 67

      Chapter 8

      Lithium-Ion Battery Recycling

      Unit ................ 68-78

      Solar Panel Recycling Plant . 68

      Recycling Technology ........... 69

      System Structure ................... 70

      Core Advantages ................... 70

      Technical Parameter ............. 71

      Lithium-ion Batteries Recycling

      Plant Setup ..................... 71

      Lithium-Ion Battery: An

      introduction ..................... 71

      Overview of Lithium Ion Battery

      Recycling Plant .............. 72

      Types of Batteries ................. 72

      Benefits of a Lithium-Ion

      Battery Recycling Plant .. 72

      Methods of Recycling ............ 73

      Responsibilities of a Recycler

      in Li-Ion Battery

      Recycling ........................ 73

      Requirements for a Li-Ion

      Battery Recycling Plant .. 74

      Machines Used in Lithium-Ion

      Battery Recycling Plant .. 75

      Documents Required for a

      Lithium Battery Recycling

      Plant ............................... 76

      Process for Setting Up a

      Lithium-Ion Battery

      Recycling Plant in India . 76

      Cost of the Lithium Battery

      Recycling Plant .............. 77

      Lithium Battery Recycling

      Process .......................... 78

      Chapter 9

      Aluminium Recycling

      Plant ....................... 79-86

      Indian Market Potential for

      Aluminium Recycling ..... 79

      Aluminium Recycling

      Process .......................... 81

      Advantages of Recycling

      Aluminium ...................... 82

      Aluminium Recycling Plant

      Setup .............................. 82

      Eligibility Criteria for Setting up

      a Aluminium Recycling

      Plant ............................... 83

      Documents or Licenses

      Required for Setting up a

      Aluminium Recycling

      Plant ............................... 84

      Procedure for Setting up a

      Aluminium Recycling Plant

      in India ............................ 84

      Cost of Setting Up a Aluminium

      Recycling Plant .............. 85

      Opportunities in India’s

      Aluminium Recycling

      Sector ............................. 86

      PART 3: AGRICULTURAL &

      ORGANIC WASTE

      UTILIZATION

      Chapter 10

      Bio Coal Briquettes from

      Agricultural Waste 89-95

      Materials Used in the

      Production of Bio-Coal

      Briquettes ....................... 90

      Process of Bio-Coal Briquette

      Production ...................... 91

      Bio Coal Briquetting Press

      Process .......................... 91

      How Briquette Machines Are

      Used to Produce Bio-Coal

      Briquettes ....................... 92

      Advantages of Bio Coal

      Briquettes ....................... 94

      Bio Coal Briquettes Uses .... 94

      Benefits of Briquettes ........... 95

      Chapter 11

      Organic Fertilizer

      Manufacturing from

      Cow Dung ............ 96-111

      Contents of the invention ...... 96

      Preprocessing ....................... 97

      Detailed description ............101

      Cow Dung Fermentation

      Process ........................106

      Acquisition and preparation of

      raw organic matter .......107

      Fermentation of organic

      matter ...........................107

      Temperature control ............108

      Crushing, screening and

      mixing ...........................108

      Organic waste to cow dung

      poultry fertilizer

      granulation ...................108

      Organic-inorganic fertilizer

      drying and cooling .......109

      Coating technology applied to

      organic cow dung

      fertilizer .........................109

      Organic cow dung fertilizer

      screening and grading/

      classification ................ 110

      Commonly used raw

      materials for making

      organic fertilizer ............ 111

      Chapter 12

      Particle Board from Rice

      Husk .....................112-115

      Market Potential ................... 113

      Particle Board

      Manufacturing ............... 113

      Raw Material Requirement . 113

      Manufacturing Process ....... 113

      Flow Chart of Manufacturing

      Process ........................ 114

      List of Required Machinery and

      Equipment .................... 114

      Chapter 13

      Rice Bran Oil Extraction

      Process ............... 116-127

      The Market Potential for rice

      bran oil ......................... 116

      Rice Bran Oil Extraction

      Process ........................ 117

      Raw Material Preparation ... 118

      Oil Extraction ....................... 118

      Rice Bran Oil Refining ........ 118

      Steam Distillation ................ 118

      The rice bran oil solvent

      extraction process ........ 118

      Mechanical extraction vs

      solvent extraction ......... 118

      Rice bran preparation ......... 119

      Next comes palletization or

      pelletizing. ....................120

      Rice bran oil extraction .......120

      Refining crude rice bran oil 121

      Emerging non-conventional

      techniques in rice bran oil

      extraction ......................122

      Supercritical CO2 extraction 123

      Subcritical CO2 fluid

      extraction ......................123

      Subcritical water extraction .123

      Ultrasound-assisted

      extraction ......................124

      Microwave-assisted

      extraction ......................124

      Producing rice bran oil within a

      sustainable circular

      economy .......................124

      Sustainable sourcing ..........125

      Energy-saving technology ...125

      Safer solvents .....................125

      Downstream value addition 125

      Chapter 14

      Pathogen Reductions

      during Waste

      Treatment ........... 128-148

      Main Pathogen Reduction

      Methods and

      Mechanisms.................128

      Main Aspects and Benefits of

      Anaerobic Digestion ....129

      Thermal Treatment &

      Hydrolysis .....................129

      Biological processes ..........130

      Membrane Bioreactors

      (MBRs) ..........................131

      Advantages ..........................132

      Types of membranes ..........133

      Advanced Oxidation Processes

      (AOPs) ..........................133

      Agricultural Applications &

      Mechanisms.................134

      Algal-Based Systems .........134

      Components and

      Applications ..................135

      Cultivation Systems and Future

      Prospects .....................135

      Benefits of Algae in

      Agriculture: ....................136

      Physical Removal

      Mechanism ...................136

      Sedimentation .....................136

      Filtration ...............................137

      Chemical Removal

      Mechanism ...................138

      Adsorption ...........................138

      UV Radiation by Sunlight ....140

      Biological Removal

      Mechanism ...................141

      Natural Die-Off ....................141

      Predation .............................142

      Factors Affecting the Removal

      of Bacterial and Viral

      Pathogens in OWTSs ..142

      Disinfection Treatment Unit 143

      Effect of Filter Materials ......143

      Media Grain Size .................143

      Effect of Environmental

      Conditions ....................145

      Seasonal Changes .............145

      pH ........................................146

      Water Composition .............147

      Sunlight Intensity .................147

      Pathogen Species and

      Morphologies ...............148

      PART 4: PLASTIC & PET

      WASTE RECYCLING

      Chapter 15

      Flexible and Rigid Plastic

      Recycling ........... 151-160

      Differences between Rigid

      and Flexible Plastics

      Recycling ......................151

      Classification of Plastics ....151

      Types of Rigid Plastics .......151

      Types of Flexible Plastics ...152

      Recycling Processes ..........152

      Methods for Recycling Rigid

      Plastics .........................153

      Collection and Sorting ........153

      Cleaning and Crushing ......153

      Foundry & Extrusion ............153

      Processes for Recycling

      Flexible Plastics ...........153

      Gathering and Challenges .153

      Cleaning and Recovery ......153

      Infrastructure Limitations ....153

      Plastics Recycling

      Challenges ...................154

      Obstacles in Rigid

      Recycling ......................154

      Pollution and Waste ...........154

      Inefficiencies in Harvesting 154

      Challenges when Recycling

      Flexible Plastics ...........154

      Lack of Dedicated

      Infrastructure ................155

      Low Public Awareness .......155

      Environmental Impact of

      Plastic ...........................155

      Consequences of Rigid

      Plastics .........................155

      Durability and Degradation .155

      Energy Savings by

      Recycling ......................155

      Effects of Flexible Plastics ..156

      Decomposition Problems ..156

      Visual and Environmental

      Pollution .......................156

      Alternatives to improve

      recycling .......................156

      Promotion of the Circular

      Economy.......................156

      Innovations in Materials and

      Techniques ...................156

      Education and Public

      Awareness ...................157

      Types of Plastic Shredders 157

      Single Shaft Plastic

      Shredders ....................157

      Dual/Twin Shaft Plastic

      Shredders ....................158

      Plastic Granulators/

      Crushers ......................158

      Plastic Washing Lines : Rigid

      vs Film Systems ..........159

      Types of Plastic Washing

      Lines .............................159

      Rigid Washing Line ............159

      Organic Waste Composting

      Machine ........................159

      Semi Automatic Organic Waste

      Composting Machine ..160

      Chapter 16

      Plastic Granules from

      Plastic Waste ..... 161-171

      Plastic Granules Manufacturing

      Plant .............................161

      Key Components of a Plastic

      Granules Manufacturing

      Plant .............................162

      Plastic Types Processed in the

      Plant .............................163

      Process Flow of a Plastic

      Granules Manufacturing

      Plant .............................163

      Investment and Setup

      Considerations ............163

      Benefits of a Plastic Granules

      Manufacturing Plant .....164

      Industries that Use Plastic

      Granules .......................164

      Steps in the Manufacturing

      Process ........................164

      Quality Control in Plastic Granules

      Manufacturing ......165

      Granules Manufacturing

      Process ........................165

      Recycling Process ..............166

      Challenges in Plastic Granules

      Manufacturing ...............167

      Licenses and Documents

      Needed for Plastic

      Granules Business .....167

      Required Licenses and

      Documents Needed for

      Plastic Granules

      Business ......................167

      Business Registration

      Certificate .....................168

      Factory license ....................168

      Fire NOC .............................169

      Registration as a Plastic Waste

      Processor (PWP) .........170

      Consent NOC ......................170

      Agglomeration Pelletizing

      Line ...............................171

      Chapter 17

      Recycling of PET

      Bottles ................ 172-182

      PET Recycling .....................172

      Uses of recycled PET .........172

      Process of recycling of PET

      plastic ...........................173

      Collecting the PET plastic

      bottles ...........................173

      Separating the PET bottles 173

      Compacting the PET

      bottles ...........................174

      Recycling of the PET

      bottles ...........................174

      Transforming recycled PET

      plastic bottles into

      pellets ...........................175

      Washing and decontamination

      ............................175

      Reforming and reusing the

      PET bottles ...................176

      PET Bottle business ...........176

      Benefits of Plastic Waste

      Recycling Plant ............177

      Requirements for Opening a

      Plastic Waste Recycling

      Plant .............................177

      Land Requirement ..............177

      Requirement of Utilities ......178

      Technician and Labors .......178

      Types of Plastic Recycling

      Machines ......................178

      Documents Required for

      Setting up a Plastic

      Recycling Business .....179

      How to Apply for Plastic Waste

      Recycling Plant

      License? .......................179

      Renewal and Validity of Plastic

      Waste Recycling Plant .180

      Chapter 18

      Polyester Staple Fiber from

      PET Waste.......... 183-194

      Polyester Staple Fiber .........183

      Key Components of a Polyester

      Staple Fiber Production

      Line ...............................184

      Raw Material Preparation ...184

      Polymerization .....................184

      Extrusion and Spinning .......185

      Drawing and Crimping .......185

      Cutting (Staple Formation) ..185

      Finishing and Packing ........185

      The Polyester Staple Fiber

      Production Process .....185

      Step 1: Raw Material Selection

      and Processing ...........185

      Step 2: Extrusion and Fiber

      Formation .....................186

      Step 3: Crimping and

      Cutting ..........................186

      Step 4: Fiber Finishing ........186

      Polyester Staple Fiber

      Manufacturing Process 186

      Types of Polyester Staple

      Fiber .............................187

      Applications of Polyester Staple

      Fiber .............................188

      Setting Up a Polyester Staple

      Fiber Production Line ..188

      Specifications of Recycled

      Polyester Staple Fiber

      (PSF): ............................189

      Application of Polyester Staple

      Fiber (PSF) ...................190

      Polyester Staple Fiber from

      PET Waste Plant Setup190

      Steps to Setup Polyester Staple

      Fiber from PET Waste

      Plant .............................190

      Step 1: Conduct Market

      Research ......................190

      Step 2: Draw up a Business

      Plan with Every Detail ..190

      Step 3: Raise Finance ........191

      Step 4: Choose a Suitable

      Location ........................191

      Step 5: Obtain All Required

      Licenses and Permits .192

      Step 6: Sourcing High-Quality

      Machinery .....................192

      Step 7: Set Up the Plant .....192

      Step 8: Establish a Collective

      System ..........................193

      Step 9: Recycle Processes 193

      Step 10: Quality Control ......193

      Step 11: Marketing and

      Sales ............................194

      Step 12: Keep an Eye on and

      Enhance .......................194

      Chapter 19

      PET Bottles from PET

      Preform .............. 195-203

      Introduction: PET Bottles ....195

      PET preforms ......................195

      Process Details ..................196

      Manufacturing Stages .........196

      One-Step Process ...............196

      Two-Step Process ...............197

      Manufacturing Process Flow

      Diagram of PET Bottles

      from PET Preform ........198

      PET Bottles: Uses, Recycling,

      Business and Plant Setup

      199

      PET Recycling .....................199

      Uses of recycled PET .........199

      PET Bottle business ...........200

      Prerequisites for setting up

      PET manufacturing

      business ......................201

      PET bottle manufacturing:

      Registration and licenses

      201

      PET bottles crushing plant

      setup .............................201

      Machinery setup and raw

      materials ......................202

      Chapter 20

      PET Flakes from PET

      Bottles ................ 204-211

      Process of making PET flakes

      to PET bottles:- ............204

      Hot washed PET Flakes.....205

      Cold washed PET Flakes ..206

      Unwashed PET Flakes .......206

      Overall, the textile and apparel

      industry is the most

      prominent for purchasing

      PET flakes ....................207

      The packaging industry helps

      support the circular

      economy. ....................207

      Cosmetics and Personal Care

      Packaging ....................207

      Automotive Industry:

      Engineering Excellence

      with Recycled

      Materials .....................208

      Building and Construction

      Materials: Eco-friendly

      Infrastructure ................208

      Home and Garden Products:

      Consumer Uses ..........208

      Electronics and Technology

      Industry .........................209

      Medical and Healthcare

      Uses .............................209

      Quality Standards and

      Certification in PET Flakes

      Production ....................209

      Quality Control Procedures 209

      Color and Grade

      Differentiation ...............210

      Recycling Process of RPET

      Flakes ........................... 211

      The Market for RPET

      Flakes ........................... 211

      Government Regulations .... 211

      Chapter 21

      Texturised Yarn from Waste

      PET Bottles ........ 212-217

      Bottle-to-fiber recycling ........213

      Recycled polyester yarn

      manufacturing process 214

      Step-01: Collecting and

      Cleaning .......................214

      Step-02: Shredding .............214

      Step-03: Processing ...........215

      Step-04: Melting ...................215

      Step-05: Polyester recycled

      yarn ...............................215

      Advantages of polyester

      recycled yarn ................215

      Reduction of plastics in

      landfills .........................216

      Energy Saving .....................216

      Is recycled polyester

      sustainable? ................216

      Applications of Recycled

      Polyester Yarn ..............216

      Is recycled polyester safe to

      wear? ............................217

      Best recycled pet yarn

      manufacturers ..............217

      Chapter 22

      FSSAI’s Guidelines for

      Recycled PET in

      Food Contact

      Materials ............ 218-224

      Guidelines for Acceptance of

      Recycled Polyethylene

      Terephthalate (PET) as

      Food Contact Material

      (FCM-rPET) ...................218

      Scope of the Guidelines .....219

      Definitions for the Guidelines

      for Recycled PET as Food

      Contact Material ...........219

      Benefits of New FSSAI

      Guidelines ....................221

      Marking and Labelling of FCMrPET

      ..............................222

      Process Requirements for

      FCM-rPET .....................222

      Conditions for the Authorization

      of FCM-rPET .................223

      Documentation for FCM-rPET

      Authorization .................224

      Application Process for

      Authorization of

      FCM-rPET .....................224

      Chapter 23

      Financial Support for

      Establishing Recycling

      Plants ................. 225-230

      Understanding the Guidelines

      for One-Time Financial

      Assistance for the

      Establishment of Recycling

      Plant and Machinery ....225

      Objectives of the

      Guidelines ....................226

      Details of Plastic Recycling

      Facilities .......................226

      Oversight Mechanism for

      Plastic Recycling Units 227

      SPCBs/PCCs

      Responsibilities: ..........227

      CPCB Responsibilities .......228

      Post-Commissioning

      Monitoring .....................228

      Inspection by Urban Local

      Bodies (ULBs) .............228

      Financing Structure .............228

      Support for Capital

      Expenditure: .................228

      Cost Sharing .......................229

      Disbursement Mechanism .229

      Eligibility Criteria of One-Time

      Financial Support for

      Establishing Recycling

      Plants & Machinery ......229

      Documents Required for One-

      Time Financial Support for

      Establishing Recycling

      Plants & Machinery ......230

      Process of Application,

      Evaluation & Approval

      Mechanism ...................230

      PART 5: OTHER

      SPECIALIZED RECYCLING

      PROCESSES

      Chapter 24

      Caffeine Extraction from

      Tea Waste .......... 233-238

      Properties of Caffeine .........234

      Effects of Caffeine ...............234

      Advantages of Caffeine .......234

      Caffeine Extraction ..............235

      Step-by-Step Extraction

      Process .......................236

      Main Considerations ..........237

      Trandermal patch using

      extracted caffeine as a

      drug ..............................237

      Chapter 25

      Disposable Tableware from

      Sugarcane and Wheat

      Bagasse.............. 239-244

      The Production Process .....239

      Composition and

      Properties ....................240

      Bagasse-based Tableware - An

      Eco-Friendly Alternative 241

      Eco-Friendly Alternative .......241

      Biodegradable and

      Compostable ...............241

      Versatile and Durable .........241

      Sugarcane Bagasse and

      Wheat Straw .................242

      Step-by-Step: How to Produce

      Eco-Friendly Tableware 242

      Key Machinery Required .....243

      Where Is It Suitable to Start

      This Business? ...........243

      Investment Potential ...........244

      Chapter 26

      Lubricating and Waste Oils

      Recycling ........... 245-266

      Introduction ..........................245

      Analysis of properties .........246

      Methods for Waste Oil

      Purification: ...................246

      Physical method .................246

      Chemical method ...............248

      Physicochemical method ...249

      Recovery of Waste Lubricating

      Oil .................................249

      Conventional method and

      process ........................249

      Steps in the Waste Oil

      Purification Process .....250

      Waste lubricating oil treatment

      by extraction and

      adsorption ....................251

      Purifying Waste Cooking Oil

      251

      Used Engine Oil

      Purification ....................251

      Vacuum distillation ..............252

      Methyl Ethyl Ketone (MEK)

      Process ........................252

      Treating waste engine oil with

      bleaching agents .........253

      Acid Treatment ....................253

      Bleaching .............................253

      Neutralization .......................253

      Bleaching using activated

      Carbon ..........................254

      Sedimentation .....................254

      Filtration ...............................254

      Acids in Waste Oil

      Purification ....................254

      Proper Disposal of Used

      Cooking Oil ..................255

      Waste Oil Purification

      Systems .......................256

      System 1: Vacuum Hydraulic

      Oil Dehumidifier/Waste Oil

      Purification Machine .....256

      System 2: DTS Multifunctional

      Waste Oil Purification &

      Regeneration

      Equipment ....................256

      System 3: Waste Cooking Oil

      Recycling Filter

      Machine ........................257

      System 4: Waste Oil Recycling

      Plant .............................257

      System 5: Vacuum Dehydration

      Oil Purification Systems

      (VDOPS) Oil Purifier .....257

      Additional Features .............257

      System 6: Portable Oil Filtration

      System ..........................258

      Oil Property Restoration .....258

      System 7: Heavy Fuel Waste

      Oil Purification Centrifuge

      Separator Machine .......258

      Automation and Efficiency ..258

      Processes for Waste Oil

      Purification ....................258

      Sedimentation .....................259

      Vacuum Treatment ..............259

      Adsorption Method ..............260

      Membrane Filtration ............260

      Acid Treatment ....................260

      Solvent Extraction ................260

      Clay Treatment ....................261

      Reprocessing & Re-Refining of

      Used Oil .......................261

      Used Oil Treatment: Vacuum

      Distillation & Clay

      Treatment .....................262

      Recycling Waste Oil ............262

      Used Lubricant Oil Recycling

      Process: .......................263

      Benefits of waste Oil

      Purification ....................263

      Supports Sustainability

      Efforts ...........................263

      Reduces Carbon

      Emissions: ...................263

      Eliminates Landfilling

      Needs ...........................264

      Encourages Innovation: ......264

      Cost Savings .......................264

      Minimizes Pollution Risks ..264

      Challenges in Waste Oil

      Purification ....................265

      Storage and Transport ........265

      Advanced Technologies ......265

      Handling Hazardous

      Byproducts ....................265

      Health Risks .......................266

      Awareness Issues ..............266

      Chapter 27

      Waste Tyre

      Pyrolysis ............. 267-273

      Aspects of Waste Tyre

      Pyrolysis ......................268

      Tyre Pyrolysis Process: Step-by-

      Step ...............................269

      Step 1: Pre-treatment &

      Feeding ........................269

      Step 2: Thermal Cracking in the

      Reactor .........................270

      Step 3: Oil Gas

      Condensation ..............270

      Step 4: Carbon Black

      Discharge .....................270

      Pyrolysis Process of WTs at

      Different Temperatures 270

      Effect of Temperature on

      Pyrolysis Products .......271

      Chapter 28

      Biomass Charcoal

      Unit ..................... 274-285

      Biomass materials for making

      charcoal ........................274

      Starting a Biomass Briquette

      Business ......................276

      Step 1: Market Research and

      Feasibility Study ...........276

      Step 2: Developing a Biomass

      Briquettes Business Plan

      276

      Step 3: Setting Up a Briquettes

      Manufacturing Plant .....277

      Step 4: Estimating Briquettes

      Manufacturing Plant

      Cost ..............................277

      Step 5: Quality Control and

      Compliance ..................278

      Step 6: Marketing and

      Sales ............................278

      Benefits of IID Membership

      ...............................278

      Economic and Environmental

      Impact of Biomass

      Energy ..........................279

      Biomass/Solid waste/Sludge

      Carbonization Line .......280

      Challenges and Solutions in

      India’s Biomass Sector281

      Advancements Driving

      Biomass Energy

      Forward ........................282

      Importance of Emission

      Standards for Coal

      Briquette Industry .........283

      Effluent Standards for Briquette

      Industry (Coal) ..............283

      Technologies to Control

      Pollution from Briquette

      Industry (Coal) ..............284

      Monitoring and Reporting ...285

      Chapter 29

      Activated Carbon from

      Coconut Shell

      Unit ..................... 286-291

      Product Specification ...........287

      The sector wise demand ...287

      Manufacturing Process .......288

      Process flow sheet for Activated

      carbon from Coconut

      shells by steam activated

      process ........................289

      Plant and Machinery ...........289

      Types of Coconut Shell

      Activated Carbon ..........290

      Granular Activated Carbon

      (GAC) ............................290

      Powdered Activated Carbon

      (PAC).............................290

      Impregnated and Specialty

      Grades ..........................290

      Applications of Coconut Shell

      Activated Carbon ..........290

      Water Treatment .................291

      Wastewater Treatment ........291

      Air and Gas Purification ......291

      Food and Beverage Industry

      291

      Gold Recovery and Chemical

      Processes ....................291

      Pharmaceutical and Medical

      Uses .............................291

      PART 6: COMPLIANCE,

      STANDARDS, AND

      RESOURCES

      Chapter 30

      Biomedical Waste Management

      Unit ........... 295-307

      Introduction ..........................295

      The Importance of Proper

      Biomedical Waste

      Management ................295

      Necessity of Biomedical Waste

      Management ................296

      Classification of Biomedical

      Waste ...........................296

      Objective of Biomedical

      Management ................297

      Bio-Medical Waste

      Management ................297

      Steps involved in Bio-medical

      Waste Management.....297

      Bio-Medical Waste

      Segregation ..................298

      Packaging ............................299

      Collection .............................300

      Labelling ..............................301

      Storage of Biomedical

      Waste ...........................301

      Transport of clinical waste to

      treatment/disposal unit

      outside the hospital .....302

      Central Waste Collection Room

      for Bio-medical Waste .302

      Central Storage for HCFs

      Having Captive Treatment

      and Disposal System ..303

      Record Keeping ..................304

      Treatment of Biomedical

      Waste ...........................305

      Incineration ..........................305

      Autoclaving ..........................306

      Chemical treatment ............306

      Microwaving .........................306

      Irradiation .............................306

      Disposal of Biomedical

      Waste ...........................307

      Chapter 31

      BIS Standards ......... 308-310

      Key BIS Standards for Waste

      Recycling: .....................308

      Mandatory BIS Standards for

      Waste Bags and

      Containers ....................309

      Standards for Recyclable

      Waste (Red & Blue

      Category) ......................309

      Requirements for Recycling

      Facilities .......................310

      Key Prohibitions ..................310

      Chapter 32

      Photographs of Plant and

      Machinery with Suppliers

      Contact Details 311-315

      Plant and Machinery with

      Suppliers .............. 314-315

      PART 7: INNOVATION,

      SUSTAINABILITY AND

      FUTURE TRENDS IN WASTE

      MANAGEMENT

      Chapter 33

      Carbon Credit Opportunities

      in Waste Management

      ................... 319-329

      Basics of Carbon Credits /

      Carbon Trading ............319

      Aspects of Carbon Trading 320

      Relevant Methodologies .....321

      Methodologies and

      Opportunities ................321

      Waste Projects that Qualify 323

      Eligible Waste Projects ......323

      Measuring Emissions

      Reductions ...................323

      Aspects of Measuring

      Emissions Reductions

      (MRV) ............................324

      Carbon Credit

      Opportunities ................324

      Requirements for Successful

      Credits ..........................324

      Registration Processes /

      Standards .....................325

      Registration Process Steps 325

      Carbon Credit Standards ....325

      Carbon Credit Opportunities &

      Sectors .........................326

      Concepts & Requirements .326

      Indian Carbon Market (ICM)

      Focus ............................326

      Case Studies .......................327

      The Greater Chennai

      Corporation ..................327

      Ahmedabad Municipal

      Corporation ..................328

      Challenges & Risks ...........328

      Mitigation Strategies ............329

      Chapter 34

      Green Hydrogen Production

      from Waste

      Streams .............. 330-338

      What is “green hydrogen” vs

      grey / blue / etc. ...........330

      Key Differences in Hydrogen

      Production ....................330

      Black, brown and grey

      hydrogen .......................331

      Blue hydrogen .....................331

      Green hydrogen ..................332

      Other colours of hydrogen ..332

      Waste-to-Hydrogen

      Pathways ......................333

      Plasma oxy-gasification of

      MSW / agri-waste. (e.g.

      NTPC’s demo plant) ....333

      Collaboration and Catalyst

      Development ................333

      Operational Capabilities and

      Environmental Impact ..333

      Photoreforming of plastics /

      biomass to hydrogen ..334

      Aspects of Photoreforming .334

      Biomass to hydrogen .........334

      Pathways for Hydrogen

      Production ....................335

      Advantages and Environmental

      Impact ...........................335

      Challenges ..........................335

      Non-thermal plasma methods;

      gasification + separation

      techniques; membrane +

      PSA etc. ........................336

      Aspects of the Integrated

      Technologies: ...............336

      Global Hydrogen Regulatory &

      Policy Trends (2025-2026)

      337

      Regional Incentives &

      Subsidies .....................338

      Chapter 35

      AI and IoT in Waste

      Processing

      Automation ........ 339-348

      Introduction ..........................339

      Sorting waste with AI ...........340

      AI and robotics working

      together ........................341

      Smart bins and AI ...............341

      Smart Waste Management

      System: .........................342

      IoT-Based Waste Management

      Framework ...................343

      Smart Bins ..........................343

      Automated Sorting Systems343

      Real-Time Monitoring and

      Analytics .......................344

      Fleet Management for Waste

      Collection .....................344

      Benefits of IoT in Waste

      Management ................344

      Operational Efficiency .........344

      Environmental Impact .........344

      Enhanced Recycling Rates 345

      Data-Driven Decision Making

      345

      Case Studies and Data

      Analysis ........................345

      Recycling Automation Using IoT

      346

      Smart Sensors for Material

      Identification .................346

      AI-Powered Sorting

      Mechanisms.................346

      Automated Recycling Facilities

      347

      Case Study: Visakhapatnam

      city .................................348

      How to Make Project Report?

      Detailed Project Report (DPR) includes Present Market Position and Expected Future Demand, Technology, Manufacturing Process, Investment Opportunity, Plant Economics and Project Financials. comprehensive analysis from industry covering detailed reporting and evaluates the position of the industry by providing insights to the SWOT analysis of the industry.

      Each report include Plant Capacity, requirement of Land & Building, Plant & Machinery, Flow Sheet Diagram, Raw Materials detail with suppliers list, Total Capital Investment along with detailed calculation on Rate of Return, Break-Even Analysis and Profitability Analysis. The report also provides a birds eye view of the global industry with details on projected market size and then progresses to evaluate the industry in detail.

      We can prepare detailed project report on any industry as per your requirement. 

      We can also modify the project capacity and project cost as per your requirement. If you are planning to start a business, contact us today.

      Detailed Project Report (DPR) gives you access to decisive data such as:

      • Market growth drivers
      • Factors limiting market growth
      • Current market trends
      • Market structure
      • Key highlights

      Overview of key market forces propelling and restraining market growth:

      • Up-to-date analyses of market trends and technological improvements
      • Pin-point analyses of market competition dynamics to offer you a competitive edge major competitors
      • An array of graphics, BEP analysis of major industry segments
      • Detailed analyses of industry trends
      • A well-defined technological growth with an impact-analysis
      • A clear understanding of the competitive landscape and key product segments

      Need Customized Project Report?

      1. Ask for FREE project related details with our consultant/industry expert.
      2. Share your specific research requirements for customized project report.
      3. Request for due diligence and consumer centric studies.
      4. Still haven't found what you're looking for? Speak to our Custom Research Team

      About Engineers India Research Institute:

      EIRI Board is a single destination for all the industry, company and country reports. We feature large repository of latest industry reports, leading and niche company profiles, and market statistics prepared by highly qualified consultants and verified by a panel of experts.

      Note: We can also prepare project report on any subject based on your requirement and country. If you need, we can modify the project capacity and project cost based on your requirement.

      Our reports provide an expansive market analysis of the sector by covering areas like growth drivers, trends prevailing in the industry as well as comprehensive SWOT analysis of the sector.

      Our Clients

      Our Approach

      • Our research reports comprehensively cover Indian markets (can be modified as per your country), present investigation, standpoint and gauge for a time of five years*.
      • The market conjectures are produced on the premise of optional research and are cross-accepted through associations with the business players
      • We use dependable wellsprings of data and databases. What's more, data from such sources is handled by us and incorporated into the report

      Why buy EIRI reports?

      1. Our project reports include detailed analysis that help to get industry Present Market Position and Expected Future Demand.
      2. Offer real analysis driving variables for the business and most recent business sector patterns in the business
      3. This report comprehends the present status of the business by clarifying a complete SWOT examination and investigation of the interest supply circumstance
      4. Report gives investigation and top to bottom money related correlation of real players/competitors
      5. The report gives gauges of key parameters which foresees the business execution